8. ROSCO Control of Marine Hydrokinetic Turbines (MHKs)

Note

The fixed-blade-pitch (FBP) control method, its implementation in ROSCO and the ROSCO toolbox, and the verification study documented here were developed by David Stockhouse (University of Colorado). This page is adapted from his presentation Fixed-Blade-Pitch Control in ROSCO for MHK Turbines [Stockhouse2025].

8.1. Introduction

Here, we detail the control of MHK turbines in above-rated flow speeds. In below-rated flow speeds, torque control is used to operate the turbine at its maximum tip speed ratio (TSR) and pitch angle, as it is for wind turbines [Johnson2006].

The ROSCO baseline for marine turbines is adapted from the variable-pitch wind turbine controller [Abbas2022]. Many marine turbine designs, however, do not have pitch actuators, because the cost, complexity, and reliability burden of a submerged pitch system is often prohibitive. Assuming a fixed (optimal) blade pitch, we instead redefine the operating schedule of TSR to find the equilibrium between hydrodynamic and generator torque. This trades pitch actuation for trade-offs in blade loads, rotor speed, generator sizing, and environmental impact, which are discussed throughout this page.

Regulating power above rated requires a means of reducing the power coefficient \(C_p\). For MHK turbines equipped with pitch actuators, those turbines can use control schemes similar to those used by wind turbines, which reduce the \(C_p\) surface by increasing the pitch angle and decreasing TSR (black). For MHK turbines without pitch actuation, we provide a few control methods for controlling the power of the turbine using only torque control. Any such controller is constrained by the requirement that the steady state operating points be in equilibrium with the inflow torque. Overspeed control increases the TSR along the fixed pitch line on the \(C_p\) surface below (blue circle) by decreasing the generator torque. Underspeed control decreases the TSR (red circle) by increasing the torque.

../_images/02_cp_surface_annotated.png

The feature set added to ROSCO consists of an FBP generator torque controller that is configurable to automatically generate an overspeed or underspeed operating schedule, a configurable control approach for realizing that operating schedule, and automatically tuned feedback gains.

8.2. Variable-Pitch MHK Control

Nothing in the ROSCO controller changes for an MHK turbine that does have pitch actuators. The same collective pitch PI controller, gain scheduling, peak shaving, and setpoint smoothing are used as for a wind turbine. Only the tuning inputs change, and a few of them change enough to be worth noting. A worked example is provided in Examples/26_marine_hydro.py, tuned from Examples/Tune_Cases/RM1_MHK.yaml. The comparisons below are against the NREL 2.8 MW land-based reference turbine (Examples/Tune_Cases/NREL2p8.yaml).

8.2.1. Fluid Density

Density selection is the only MHK-specific branch in the tuning toolbox. When the OpenFAST model sets MHK > 0, the toolbox uses the water density WtrDens in place of AirDens. The sensitivities used for gain scheduling (\(\partial\tau/\partial\beta\), \(\partial\tau/\partial\lambda\)) and the thrust used for peak shaving all scale linearly with \(\rho\), so the rotor performance tables and the density must describe the same fluid. Otherwise the gains are wrong by nearly three orders of magnitude. In the generated DISCON file this value appears as WE_RhoAir, which is 1025 kg/m³ for the RM1, despite the parameter name.

8.2.2. A Compressed Region 3

Tidal flow speeds span a much narrower range than wind speeds, which compresses everything the above-rated controller has to work with.

NREL 2.8 MW (wind)

RM1 (MHK)

Cut-in / rated / cut-out

3 / 11.4 / 25 m/s

0.5 / 2.0 / 4.0 m/s

Cut-out / rated ratio

2.2

2.0

Gain-schedule pitch range

4.4° to 25.6°

1.7° to 14.3°

Rotor performance table

30 x 30, TSR 2–12

36 x 49, TSR 0.5–24.5

The entire above-rated pitch travel is roughly 12°, so the pitch resolution of the \(C_p\) table limits the quality of the gain schedule in a way it does not for a wind turbine. The RM1 table is generated at 1° pitch resolution for this reason. The pitch rate limit PC_MaxRat is rarely the binding constraint: the RM1 keeps the wind default of 0.1745 rad/s (10°/s), which traverses the full Region 3 range in about a second.

8.2.3. Pitch Bandwidth and Filtering

The RM1 is tuned at omega_pc = 0.35 rad/s with zeta_pc = 1.0, against 0.137 rad/s and 2.0 for the 2.8 MW wind turbine, so the pitch loop is roughly 2.5x faster. Rated rotor speed is nearly the same for both machines (1.20 versus 1.27 rad/s), so the faster loop sits closer to the rotor-periodic disturbances. How much closer depends on the blade count.

Summing the per-blade loads of a \(B\)-bladed rotor cancels every harmonic except multiples of \(B\Omega\), so only those reach rotor torque and, in turn, the generator speed the pitch controller acts on. A three-bladed rotor passes 3P, 6P, …; a two-bladed rotor passes 2P, 4P, …. Both rotors average, but a two-bladed rotor begins averaging one harmonic lower, and 1P survives on neither except through blade-to-blade imbalance. The relevant comparison is each machine’s lowest surviving harmonic:

NREL 2.8 MW (wind)

RM1 (MHK)

Blades

3

2

Lowest surviving harmonic

3P = 3.80 rad/s

2P = 2.41 rad/s

Separation from omega_pc

28x

7x

The margin is roughly four times tighter, from the combination of a faster loop and a lower first harmonic. This advantage belongs to the blade count only at a given rotor speed: a three-bladed rotor of the same diameter typically runs slower, which moves 3P back down.

Two blades carry a second penalty. The in-plane inertia of a three-bladed rotor is isotropic about the hub, while a two-bladed rotor’s varies with azimuth, so even a perfectly balanced two-bladed rotor couples to the support structure at 2P through rotor anisotropy alone.

The MHK tuning case therefore enables filtering that the wind cases leave off:

DISCON:
  F_NumNotchFilts:   2
  F_NotchFreqs:      [1.0, 2.42]   # 2.42 rad/s is 2P
  F_NotchBetaNum:    [0.0, 0.0]
  F_NotchBetaDen:    [0.25, 0.25]
  F_GenSpdNotch_N:   2
  F_GenSpdNotch_Ind: [1, 2]
  F_TwrTopNotch_N:   2
  F_TwrTopNotch_Ind: [1, 2]

Both notches are applied twice: F_GenSpdNotch_Ind filters the generator speed used by the pitch and torque loops, and F_TwrTopNotch_Ind filters the nacelle fore-aft IMU acceleration used by the floating feedback term.

The low-pass corner frequency moves the other way. F_LPFCornerFreq is derived from the blade edgewise frequency, and hydrokinetic blades are short and stiff: 60.3 rad/s for the RM1 against 8.3 rad/s for the 2.8 MW rotor. The resulting corner frequency is 15.1 rad/s rather than 2.07 rad/s, well above the control bandwidth, so the notch filters, rather than the low-pass filter, limit the achievable bandwidth.

Setpoint smoothing is also more aggressive on the pitch side, SS_PCGain = 0.05 against 0.001, because the Region 2.5 transition is compressed into a narrow band of flow speed.

8.2.4. Minimum Pitch and Peak Shaving

The RM1 uses PC_MinPit = 0, whereas the wind cases allow pitch to go negative (-10° for the 2.8 MW) to recover a small amount of \(C_p\) below rated. Peak shaving is enabled with ps_percent = 0.8, which produces a minimum pitch schedule that peaks near 11°, compared with about 20° for the wind turbine over its much wider speed range.

Peak shaving limits rotor thrust in the same way it does for a wind turbine. Whether it also provides useful margin against cavitation depends on the rotor. As shown in Rotor Speed Limits and Cavitation, the cavitation criterion is driven by rotor speed and blade section \(-C_{p,min}\), and a pitch schedule is not a substitute for evaluating it. ROSCO performs no cavitation check at runtime, so a marginal variable-pitch MHK schedule should be verified with an AeroDyn cavitation check (CavitCheck = True), which evaluates the full criterion at every blade node.

8.2.5. Torque Control and Wind Speed Estimation

Above rated, the RM1 case uses constant power (VS_ConstPower = 1) rather than the constant torque used by the wind cases, with max_torque_factor = 1.5 sizing the torque saturation limit above rated torque. Individual pitch control is disabled, as the rotor has two blades.

Note that VS_ControlMode selects the below-rated torque control strategy; VS_ConstPower selects constant-torque versus constant-power behavior above rated. The RM1 case uses VS_ControlMode = 3 (power-based TSR tracking) below rated.

The wind speed estimator is used as it is for wind turbines (WE_Mode = 2, the extended Kalman filter). The estimate drives gain scheduling, the peak shaving minimum pitch lookup, and setpoint smoothing, so degrading it to the filtered measurement (WE_Mode = 0) affects all three.

8.2.6. Floating MHK

For a floating MHK turbine (MHK = 2), the platform feedback term behaves as it does for floating wind, but with much less frequency separation to work with. The RM1 floating case has a platform frequency of 0.4 rad/s against a pitch control bandwidth of 0.35 rad/s, roughly a factor of 1.15. The negative damping problem therefore cannot be avoided by detuning the pitch controller, and is instead handled by the floating feedback term (Fl_Mode = 1, Kp_float = -0.4). Restoring stiffness comes from the mooring system rather than from waterplane area, and wave excitation is attenuated with depth but not eliminated.

8.3. Over/Underspeed Reference Setpoints for Fixed-Pitch Control

The steady state generator-speed setpoints are determined by the \(C_p\) contours intersecting with the fine-pitch line. For the RM1, the constant-power overspeed schedule reaches roughly 5.7x rated rotor speed at cut-out. How much of that range a given rotor can use is limited by cavitation, discussed in Rotor Speed Limits and Cavitation; on the RM1 the limit binds at about 1.9x, well before the schedule gets there. Rotor speed also has consequences for blade loads (high thrust).

../_images/03_cp_wg_sched.png

8.3.1. Rotor Speed Through the Rated Transition

Fixed-pitch control has no rated-speed saturation. A variable-pitch controller holds the rotor at \(\Omega_{rated}\) through Region 2.5, letting the TSR slide below \(TSR_{operational}\) as the flow speed rises to rated; with the blade pitch fixed there is no second actuator to do this, so the schedule stays on the \(TSR_{operational}\) line until the Region 3 power curve binds.

Whenever the rotor reaches rated speed before the power curve binds, the schedule therefore overshoots rated rotor speed in the band between the two. For the RM1, the rotor reaches its rated 1.204 rad/s (11.5 rpm) at 1.72 m/s while running at \(TSR_{operational} = 7\), but MPPT does not reach the 500 kW rating until 2.0 m/s. Across that band the schedule continues along the TSR line and peaks at 1.364 rad/s, or 13.0 rpm, about 1.13x rated, before the constant-power curve pulls it back down.

This is a deliberate trade in the shipped RM1 configuration, not an oversight:

  • The overshoot is well inside the cavitation limit of 2.26 rad/s (Rotor Speed Limits and Cavitation), and generator torque within that band peaks at about 6.8 kNm against a rated 8.3 kNm, so it is purely a question of drivetrain and generator speed rating. Verify that the machine tolerates a 13% speed excursion near rated before reusing this configuration.

  • The alternative is to set TSR_operational to the design TSR rather than the \(C_p\)-maximizing one. The RM1 rates at \(TSR = 6.02\) (1.204 rad/s at 2.0 m/s), and pinning TSR_operational there removes the overshoot entirely, at the cost of about 2.5% in below-rated \(C_p\) (0.4358 against 0.4471). The variable-pitch RM1 case reaches this same operating point on its own, through rated-speed saturation.

Note that v_rated means different things to the two control paths, so the two RM1 tuning cases set it differently. For variable pitch it is the rated power speed, which is where pitch regulation and the pitch gain schedule begin, and Examples/Tune_Cases/RM1_MHK.yaml sets 2.0 m/s. For fixed pitch, power regulation is set by VS_FBP_U and VS_FBP_P instead, so v_rated is the rated speed point: the flow speed at which the rotor reaches rated_rotor_speed while tracking TSR_operational. Examples/Tune_Cases/RM1_MHK_FBP.yaml sets 1.72 m/s, which makes it agree with VS_RefSpd, the speed at which ROSCO begins using the FBP lookup table.

Setting v_rated here does not cap the rotor speed, which is the easy misreading. It is where the toolbox stops holding the TSR at TSR_operational and begins solving for it from the \(C_p\) inversion, and where ROSCO switches to the lookup table. Until the power curve binds, that solved TSR is still TSR_operational, so the schedule continues up the same line and the rotor keeps accelerating past rated speed. The lookup table contains that overshoot, and ROSCO tracks it deliberately.

Torque setpoints (\(\bar{\tau}\)) determined by constant-power relationship \(\bar{\tau} = \frac{P_{rated}}{{\bar{\omega}}}\), where \(P_{rated}\) is the rated power and \(\bar{\omega}\) is the steady state generator speed.

../_images/04_cp_tg_sched.png

In Region 3, the relationship between torque and speed is nonmonotonic. Thus, more careful reference control design is required for managing the transition region. There are examples in the literature for saturation/smoothing during the transition region.

../_images/05_cp_wg_tg_sched.png

8.4. Over/Underspeed Dynamics

At each operating point, the sensitivity is computed using the gradients of the \(C_p\) surface, in the same manner as the Region 2 controller. The first-order system decay rate is represented by a single pole on the real axis: more negative means more rapidly stable (positive means unstable). Underspeed set points are open-loop unstable at high flow speeds. The sign follows from what each set point asks the rotor to do. Underspeed set points sit below \(TSR_{opt}\), where hydrodynamic torque still grows with speed and generator torque is the only thing holding the speed down. A small speed perturbation grows rather than decays, so losing torque control lets the rotor run away. Overspeed set points are past \(TSR_{opt}\), where hydrodynamic torque falls off with speed, so the operating point is self-limiting and any speed perturbation decays on its own.

../_images/07_cp_Agen_sched_annotated.png

The same result can be viewed in the flow-speed/generator-speed plane. Contours of constant hydrodynamic rotor torque intersect the constant-power generator torque schedule at the equilibrium operating points. The overspeed and underspeed branches are the two intersections available at each flow speed. The local slope of the torque surface across each intersection determines whether that equilibrium is open-loop stable.

../_images/09_cp_wg_Ta_contour_annotated.png

8.5. Fixed-Blade-Pitch (FBP) Control

At each setpoint, the torque controller gains are determined using the same process as the normal torque control in ROSCO. High magnitude gains are required to compensate for the open-loop instability of the underspeed system (red).

../_images/10_cp_kp_ki_sched.png

8.6. Alternate Region 3 Operating Schedules

Using the ROSCO toolbox, we enable the user to determine their own operational power curve, besides a constant rated power. Throughout this section, the power requirement is the generator power that the selected Region 3 power curve demands at a given flow speed, that is, the VS_FBP_P input evaluated at that speed. It is an upper bound on what is asked of the machine, not on what is available. The toolbox clips it to the power the inflow can supply at fine pitch, so the MPPT curve is the ceiling and no request can exceed it. Relaxing the constant-power constraint in Region 3 raises the peak of the power requirement, and with it the sustained power the generator must be sized for. The five power curves studied, with their peak power requirement at cut-out relative to rated power (equivalently, the generator resizing factor), are:

Region 3 power curve

Peak power requirement (x rated)

Extended Region 2 (MPPT)

8x

Quadratic extrapolation from tangent

7x

Linear extrapolation from tangent

4x

Linear to 2x rated power at cut-out

2x

Constant power

1x

These multipliers follow from the RM1 \(C_p\) surface and its \(v_{rated}\) to \(v_{cut-out}\) range, and are reported to show the relative spread between the curves. They are not general: the same five curve definitions applied to another rotor will produce different factors.

../_images/11_ext_P.png

Each non-MPPT option can follow either the overspeed or the underspeed equilibrium trajectory. The alternative power curves result in different speed and torque set points (dashed lines represent underspeed, solid overspeed). Speed setpoints always lie within the envelope bounded by the over- and underspeed constant-power trajectories. Constant power has the lowest power requirement of the five, so it departs furthest from \(TSR_{opt}\) and produces the widest speed excursion in either direction. The MPPT curve has the highest requirement and does not depart at all, tracking \(\Omega \propto v\) straight through rated. The constant-power schedule is therefore the bounding case for rotor overspeed and cavitation margin on the overspeed branch, and for generator torque headroom on the underspeed branch.

../_images/16_ext_wg_sched_annotated.png
../_images/17_ext_tg_sched.png

Contours in the \(C_p\) surface intersect with the equilibrium points in the hydrodynamic torque surface, which is what constrains the speed and torque schedule generated from a generic power curve input. Plotted in the generator torque/speed plane below, with contours of constant generator power behind them, the equilibrium trajectories run nearly along the power contours rather than across them. A small reduction in the power requirement therefore produces a large change in the equilibrium speed and torque. Note that the schedule above is plotted against rotor speed \(\Omega\), while the torque/speed plane below is plotted against generator speed \(\Omega_g = N_g \Omega\); for the RM1 the gearbox ratio is \(N_g = 53\), so the two speed axes differ by that factor. Dropping from the MPPT curve to the quadratic curve reduces the peak power requirement from 8x to 7x rated, and moves the overspeed setpoint at cut-out from roughly 2.5 to 3.5 rad/s rotor speed in the schedule above (about 130 to 185 rad/s at the generator). A 12% reduction in power buys a 40% change in speed. These values are specific to the RM1. The two branches also look very different in this plane: the underspeed branches are nearly vertical (large torque change for small speed change), the overspeed branches nearly horizontal (large speed change for small torque change).

../_images/13_ext_wg_tg_P_contour.png

The stability of the FBP set points can be represented by the sensitivity \(\frac{d\tau}{d\Omega}\), following the same over/underspeed argument as above. Values less than 0 are open-loop stable; positive values must be stabilized by the torque controller.

../_images/18_ext_Agen_sched.png

The power curve selection also impacts the rotor thrust (F). Underspeed control and lower power generally result in lower thrust. Overspeed trajectories approach substantially higher rotor thrust. The overspeed MPPT trajectory in particular reaches thrust levels that are likely unacceptable for the structure, and should be checked against the design loads before being selected.

../_images/19_ext_wg_thrust_contour.png
../_images/20_ext_wg_thrust_sched.png

8.7. Rotor Speed Limits and Cavitation

Power and thrust are not the only constraints on an FBP operating schedule. For a marine turbine, the rotor speed is also bounded by cavitation, and this bound usually decides whether the overspeed branch is available at all.

Cavitation occurs where the local pressure on the blade falls below the vapour pressure of water. Writing the suction peak in terms of the section’s minimum pressure coefficient \(C_{p,min}\),

\[p_{min} = p_{atm} + \rho g h + C_{p,min}\left(\tfrac{1}{2}\rho W^2\right) < p_{vap}\]

which rearranges into the usual cavitation number criterion,

\[\sigma = \frac{p_{atm} + \rho g h - p_{vap}}{\tfrac{1}{2}\rho W^2} > -C_{p,min}\]

Two results follow for control design.

Depth enters only as hydrostatic head. The submergence \(h\) appears nowhere except in \(\rho g h\), which sets the pressure budget available to be spent on suction. Seawater is dense enough that 10 m of depth adds about 101 kPa, roughly one additional atmosphere, so submergence is a strong lever on the available margin. The relevant depth is the shallowest point the blade reaches, so the binding condition is the blade tip at the top of its rotation.

The criterion also collapses to a rotor speed limit. The relative velocity at the tip is dominated by \(\Omega R\), so substituting \(W^2 = (\Omega R)^2 + v^2\) and solving for \(\Omega\) gives a maximum usable rotor speed:

\[\Omega_{cav} = \frac{1}{R}\sqrt{\frac{2\left(p_{atm} + \rho g h_{tip} - p_{vap}\right)}{\rho\,\sigma_v} - v^2}\]

where \(\sigma_v = -C_{p,min}\) for the outboard blade sections and \(h_{tip}\) is the tip depth at the top of its rotation. Neither the power curve nor the choice of over/underspeed branch appears in this expression. Cavitation constrains rotor speed directly, and any operating schedule that exceeds \(\Omega_{cav}\) is affected regardless of how it was generated.

Neither ROSCO nor the toolbox checks this limit. Compare the generated speed schedule against \(\Omega_{cav}\) when choosing a configuration, and confirm with an AeroDyn cavitation check (CavitCheck = True).

8.7.1. Selecting Over- vs Underspeed

Comparing \(\Omega_{cav}\) against the speed schedule a given power curve requires is the practical way to decide whether overspeed is usable for a particular rotor:

  • If the overspeed schedule stays below \(\Omega_{cav}\) across Region 3, overspeed is available, and the thrust and drivetrain-speed considerations discussed above govern the choice.

  • If it does not, the overspeed branch is unavailable for that rotor at that submergence, and the underspeed branch should be selected (VS_FBP_speed_mode = 0).

Because \(\Omega_{cav}\) scales with \(\sqrt{\rho g h_{tip}}\), machines that are deeply submerged, or that use low design tip speeds, retain more of the overspeed range than shallow, high-tip-speed rotors.

For the RM1 at its nominal 24 m hub depth, \(\Omega_{cav}\) is approximately 2.26 rad/s, or about 1.9x rated rotor speed, whereas the constant-power overspeed schedule requires roughly 5.7x rated speed at cut-out. Overspeed is therefore not available for this rotor, and the underspeed configurations (Examples 2 and 3) are the applicable ones. This is a property of the RM1 and its submergence, not a general result.

Note

For a floating MHK turbine (MHK = 2), the hub depth is not constant: platform heave and tidal range move the rotor vertically and change \(h_{tip}\) directly. A speed limit computed at nominal depth will be optimistic at the shallow end of that excursion, so the limit should be evaluated at the shallowest expected submergence rather than the mean.

The expression above is a tip, attached-flow estimate. It suits the high-TSR overspeed regime, where the outboard sections operate near zero lift and \(-C_{p,min}\) is close to its minimum value. It is optimistic for deeply stalled underspeed setpoints, whose larger \(-C_{p,min}\) it does not capture, though those setpoints have much lower relative velocity and correspondingly large margin. A schedule that is marginal against this estimate should be verified with an AeroDyn cavitation check (CavitCheck = True), which evaluates the full criterion at every blade node using the angle-of-attack-dependent \(C_{p,min}\) from the polars.

8.8. Toolbox Implementation

The ROSCO toolbox works by determining the speed and torque set points required to operate at a TSR and Cp for the desired power across flow speeds.

../_images/14_fbp_flow_chart.png

The following inputs to the ROSCO tuning yaml, under controller_params, will generate DISCON inputs to ROSCO.

Parameter

Description

VS_FBP

FBP Control Mode:

  • 0 = variable pitch (disabled)

  • 1 = constant power overspeed (nonlinear)

  • 2 = WSE-lookup reference tracking

  • 3 = torque-lookup reference tracking

VS_FBP_speed_mode

Over/underspeed mode:

  • 0 = underspeed

  • 1 = overspeed

VS_FBP_power_mode

Normalized or exact power curve values:

  • 0 = relative to rated

  • 1 = exact

VS_FBP_U

Flow speed setpoints for power curve lookup table [m/s]

VS_FBP_P

Power curve lookup table, interpreted per VS_FBP_power_mode

The following constraints apply when FBP control is enabled:

  • PC_ControlMode and VS_ConstPower must both be 0 whenever VS_FBP > 0. Blade pitch is fixed to fine pitch, so constant-power torque control may not run concurrently. PRC_Mode must not be 1, since its speed setpoint lookup would override the FBP speed reference. ROSCO aborts on any of these at runtime, and the toolbox raises an exception rather than write a configuration that cannot run.

  • PRC_Mode = 2 is allowed with FBP control. R_Torque de-rates the generator torque limit (VS_MaxTq) and the Region 3 constant-power torque, which is how Examples/31_fixed_pitch_mhk.py ramps the rating in for a soft start up. R_Pitch has no effect, since the blade pitch is fixed.

  • VS_FBP = 1 is the fixed control law \(\tau = \min(P_{rated}/\Omega_g,\ K\Omega_g^2)\), which is inherently constant-power and inherently overspeed. ROSCO ignores VS_FBP_speed_mode, VS_FBP_power_mode, and VS_FBP_P in this mode, so the toolbox overrides them to the constant-power overspeed schedule and warns if they were set otherwise. The generated operating schedule is still used, both to seed the initial generator torque and to tune the torque gains, so it must match the law ROSCO will actually run.

  • For VS_FBP = 3 (torque-lookup reference tracking), the generator torque schedule must be strictly increasing, since ROSCO inverts it to look up the speed reference. The toolbox checks the computed schedule and raises an exception otherwise. A nondecreasing power curve on the underspeed branch (VS_FBP_speed_mode = 0) is sufficient to guarantee this, because generator speed falls with flow speed there, so \(\tau = P/\Omega_g\) rises on both counts. Overspeed generally is not sufficient: generator speed rises with flow speed, so the torque falls unless the power curve rises faster than the speed, which in practice only holds near the MPPT curve.

If the generated torque schedule exceeds max_torque_factor times rated torque, the toolbox warns that the schedule may not be realizable within saturation limits. It warns rather than enforces, since the limit depends on hardware choices outside the controller.

The torque check will not catch an overspeed schedule. Overspeed reduces generator torque while raising speed, so an overspeed configuration can sit far above the cavitation limit of Rotor Speed Limits and Cavitation while the torque schedule stays well within bounds. Check overspeed schedules against that limit separately.

The Region 2 torque control mode should be chosen to match the Region 3 FBP mode, so that the two controllers hand off consistently through the transition region:

VS_FBP

Recommended VS_ControlMode

1 (constant power overspeed, nonlinear)

1 (\(k\Omega^2\))

2 (WSE-lookup reference tracking)

2 (WSE TSR-tracking)

3 (torque-lookup reference tracking)

4 (torque TSR-tracking)

Note that the ROSCO input schema (ROSCO_Toolbox tuning .yaml) contains the latest input definitions.

The three case studies verified below are provided as worked examples in Examples/31_fixed_pitch_mhk.py, which tunes against the RM1 marine turbine tuning case Examples/Tune_Cases/RM1_MHK_FBP.yaml. That script also ships three experimental configurations covering the rest of the input space; see Additional Configurations.

8.9. ROSCO Implementation

The following DISCON parameters are generated using the ROSCO toolbox, or can be determined directly in the DISCON.IN file.

Parameter

Description

VS_FBP

FBP Control Mode:

  • 0 = variable pitch

  • 1 = constant power overspeed (nonlinear)

  • 2 = WSE-lookup reference tracking

  • 3 = torque-lookup reference tracking

VS_FBP_n

Number of values in operating schedule lookup table

VS_FBP_U

Flow speed operating points in lookup table

VS_FBP_Omega

Generator speed operating points in lookup table

VS_FBP_Tau

Generator torque operating points in lookup table (must be monotonic for VS_FBP = 3)

Note that the ROSCO input schema (ROSCO_Toolbox tuning .yaml) contains the latest input definitions (under controller_params, DISCON).

8.10. Simulation Verification

A handful of example controller case studies have been developed using the RM1 marine turbine [Neary2014] to showcase the implemented features of FBP control. These configurations are

  • Example 1: Overspeed, constant power

  • Example 2: Underspeed, torque-based reference tracking

  • Example 3: Underspeed, WSE-based reference tracking

For each example, a power curve is defined and input to the ROSCO toolbox to generate operating schedules and auto-tune the gains used by the torque controller. The operating schedules for generator power, speed, and torque for each example test case are shown in the following figure.

../_images/21_cases_P_wg_tg_sched.png

Each example controller is then simulated with the RM1 marine turbine model using OpenFAST in both steady and turbulent inflow. The steady state performance of each controller is compared to the operating schedules generated by the ROSCO toolbox. The turbulent inflow uses the intensity shown in the following figure.

../_images/25_turb_intensity.png

Tidal flow design load cases differ from their wind counterparts in ways that matter for controller verification. Turbulence characteristics are not those typically encountered in atmospheric flow, the mean probability distribution is more closely isolated by environmental condition, and turbulence intensity varies heavily with site conditions. The better tidal sites are generally lower in turbulence intensity than wind sites [Milne2013]. The turbulence intensity and wave statistics used here were varied to mimic buoy data collected in the Orkney Islands, Scotland. Design requirements for tidal current converters are given in [IEC62600-2].

8.10.1. Example 1

The first example test case uses the naturally stable nonlinear feedback control law. This controller is confined to operating in the constant power, overspeed configuration. The explicit (non-reference-tracking) control law is analogous to the \(k\Omega^2\) control law sometimes used in Region 2 for wind and marine turbines [Johnson2006], and is best paired with a \(k\Omega^2\) Region 2 controller (VS_ControlMode = 1). It is easy to design and requires no tuning, but is rigid and inflexible, and its overspeed operating points carry high tip speed and blade thrust.

Note

Because this mode is inherently overspeed, it should be screened against the cavitation speed limit of Rotor Speed Limits and Cavitation before selection. For the RM1 the required speeds exceed that limit, so this example is included to demonstrate and verify the control law rather than as a recommended configuration for this rotor. It remains appropriate for rotors whose overspeed schedule stays within \(\Omega_{cav}\).

../_images/22_case1_P_wg_tg_ss.png

This controller has the best power tracking in Region 3, but it only allows constant power. The power-focused feedback approach accommodates offsets in equilibrium speed and torque made by inaccuracies in the simplified tuning model.

../_images/26_case1_P_wg_tg_turb.png

8.10.2. Example 2

The second example test case uses underspeed operation with a torque-based reference and a semi-arbitrary power curve:

  • Region-2 mode: TSR-tracking with torque-based reference (VS_ControlMode = 4)

  • Region-3 FBP mode: reference tracking with torque lookup (VS_FBP = 3)

  • The power curve may be arbitrarily specified, but should be a nondecreasing function so that the torque schedule is monotonically increasing

This configuration is highly general, but requires an aggressive torque controller to stabilize the open-loop-unstable underspeed setpoints, and therefore requires a high maximum torque signal (see max_torque_factor in the tuning yaml).

Warning

Sizing the torque limit is a safety consideration, not only a tracking one. Every underspeed setpoint sits where hydrodynamic torque increases with rotor speed, so if the commanded torque saturates below what the inflow demands, the rotor accelerates rather than settling. The aerodynamic torque curve only turns over past \(TSR_{opt}\), so the nearest stable equilibrium is on the overspeed side of the \(C_p\) peak. Insufficient torque authority on an underspeed schedule therefore does not stall the rotor to a stop: the rotor accelerates through the \(C_p\) peak and settles at high speed, in the high-thrust and cavitation-prone regime that the underspeed schedule was chosen to avoid. The same applies to any fault that removes generator torque. Size max_torque_factor above the peak hydrodynamic torque over the operating range, and ensure the shutdown path can arrest the rotor without it.

../_images/23_case2_P_wg_tg_ss.png
  • Linearly increasing power in Region 3, up to 2x rated

  • Power curve must be set so that torque schedule is monotonic

  • Decent power tracking

  • May have some misalignment with flow speed setpoint

  • Accommodates some offsets in torque and speed

  • Should be combined with reference-tracking controller in Region 2

../_images/27_case2_P_wg_tg_turb.png

8.10.3. Example 3

The third example test case uses underspeed operation with a wind speed estimator (WSE) reference [Ortega2013] and a fully arbitrary power curve:

  • Region-2 mode: TSR-tracking with WSE-based reference (VS_ControlMode = 2)

  • Region-3 FBP mode: reference tracking with WSE lookup (VS_FBP = 2)

  • The power curve can be completely arbitrarily specified

This is the most general configuration and the easiest to combine with a Region 2 controller or with alternate references. It is less robust to errors in the tuning model than the torque lookup, and shares the torque lookup’s need for an aggressive controller and high torque headroom.

../_images/24_case3_P_wg_tg_ss.png
  • Smoothly increasing power curve in Region 3

  • Would allow arbitrarily increasing or decreasing

  • Best gen speed tracking

  • May offset equilibrium torque leading to power curve error

  • Should be combined with reference-tracking controller in Region 2

../_images/28_case3_P_wg_tg_turb.png

8.10.4. Additional Configurations

Examples/31_fixed_pitch_mhk.py ships three further configurations beyond the three examples above:

  • Constant power underspeed: the Example 2 configuration (VS_FBP = 3, VS_ControlMode = 4) with the power curve held flat at rated rather than increasing.

  • Constant power overspeed via reference tracking: the Example 1 operating schedule reached through the WSE lookup (VS_FBP = 2, VS_ControlMode = 2) instead of the fixed control law.

  • Linear increasing power, leveling out: the Example 2 power curve reaching 2x rated below cut-out and flat thereafter.

These are experimental. They demonstrate the range of power curves and mode pairings the toolbox accepts, and have not been through the steady and turbulent verification campaign that Examples 1 through 3 have. Their operating schedules should be treated as illustrative rather than validated.

The cavitation caveat attached to Example 1 applies to the overspeed reference-tracking configuration as well. For the RM1 rotor, both exceed the tip cavitation limit of Rotor Speed Limits and Cavitation.

8.11. Recommendations

FBP control is well suited to marine turbines without blade pitch actuators. In certain applications, the ability to follow a generic power curve with a limited actuation capability is more advantageous than using variable-blade-pitch (VBP) control. VBP control allows constant-power operation in Region 3 matched with constant speed and torque for a flat operating schedule, and pitch-actuated turbines also experience smaller blade loads in Region 3. The FBP approach satisfies applications in which the cost and complexity of the actuators themselves are prohibitive.

Generic user input allows flexibility for variety of applications.

FBP controller implementation in ROSCO with auto-tuning and automatic generation of operating schedule to follow power curve.

Because the Region 2 and Region 3 controllers utilize the same actuator, the transition region is markedly different than what is required for a VBP Region 3 controller.

8.12. Future Work

  • Enhanced multi-constraint configuration, including constraining Region 3 rotor thrust to a constant level rather than only constraining power.

  • Explicit power reference tracking.

8.13. References

[Stockhouse2025]

Stockhouse, D. Fixed-Blade-Pitch Control in ROSCO for MHK Turbines. National Renewable Energy Laboratory presentation, 2025. (Source material for this page.)

[Abbas2022]

Abbas, N. J., Zalkind, D. S., Pao, L., and Wright, A. A reference open-source controller for fixed and floating offshore wind turbines. Wind Energy Science, 7(1), 53–73, 2022. https://doi.org/10.5194/wes-7-53-2022

[Johnson2006] (1,2)

Johnson, K. E., Pao, L. Y., Balas, M. J., and Fingersh, L. J. Control of variable-speed wind turbines: standard and adaptive techniques for maximizing energy capture. IEEE Control Systems Magazine, 26(3), 70–81, 2006. https://doi.org/10.1109/MCS.2006.1636311

[Ortega2013]

Ortega, R., Mancilla-David, F., and Jaramillo, F. A globally convergent wind speed estimator for wind turbine systems. International Journal of Adaptive Control and Signal Processing, 27(5), 413–425, 2013. https://doi.org/10.1002/acs.2319

[Neary2014]

Neary, V. S., Previsic, M., Jepsen, R. A., Lawson, M. J., Yu, Y.-H., Copping, A. E., Fontaine, A. A., Hallett, K. C., and Murray, D. K. Methodology for Design and Economic Analysis of Marine Energy Conversion (MEC) Technologies. SAND2014-9040, Sandia National Laboratories, 2014. (Source of the RM1 reference marine turbine model.)

[Milne2013]

Milne, I. A., Sharma, R. N., Flay, R. G. J., and Bickerton, S. Characteristics of the turbulence in the flow at a tidal stream power site. Philosophical Transactions of the Royal Society A, 371:20120196, 2013. https://doi.org/10.1098/rsta.2012.0196

[IEC62600-2]